Costings based on a 3000x2400 Wall Section
|
|
|
|
|
|
|
|
|
Insulform ICF Block - R3
|
|
|
|
|
|
|
|
Qty
|
Unit
|
Rate
|
Labour
|
|
Amount
|
|
|
|
|
Factor
|
Qty
|
|
Insulform Block 250 Series
|
7.2
|
m²
|
82
|
1.35
|
9.72
|
$596.16
|
Concrete Filling
|
1.1
|
m³
|
200
|
0.1
|
1.1
|
$269.50
|
Reinforcing steel
|
39.0
|
kg
|
3.5
|
0.0
|
1.6
|
$206.70
|
10 Gib interior
|
7.2
|
m²
|
6.3
|
0.2
|
1.4
|
$110.16
|
Stopping Gib
|
7.2
|
m²
|
6.5
|
|
|
$46.80
|
Ev Ceiling Junction
|
3.0
|
m
|
9.5
|
|
|
$28.50
|
Multiplst with mesh FULLY MESHED
|
7.2
|
m²
|
75
|
|
|
$540.00
|
|
|
|
|
|
Subtotal
|
$1,797.82
|
|
|
|
|
|
|
|
Timber Frame - Insulated to R2.6
|
|
|
|
|
|
Qty
|
Unit
|
Rate
|
Labour
|
|
Amount
|
|
|
|
|
Factor
|
Qty
|
|
100x50 Plate
|
6.0
|
m
|
4.2
|
0.1
|
0.7
|
$57.60
|
DPC
|
3.0
|
m
|
0.6
|
0.5
|
0.2
|
$8.55
|
Fixings
|
4.0
|
no
|
3.5
|
0.2
|
0.8
|
$50.00
|
100x50 Studs
|
16.8
|
m
|
4.2
|
0.1
|
1.7
|
$146.16
|
100x50 Dwangs
|
6.0
|
m
|
4.2
|
0.2
|
1.1
|
$73.80
|
10 Gib interior
|
7.2
|
m²
|
6.3
|
0.2
|
1.4
|
$110.16
|
Stopping Gib
|
7.2
|
m²
|
6.5
|
|
|
$46.80
|
Ev Ceiling Junction
|
3.0
|
m
|
9.5
|
|
|
$28.50
|
Insulation R2.6
|
7.2
|
m²
|
13
|
0.1
|
0.6
|
$119.52
|
Building Wrap
|
7.2
|
m²
|
3
|
0.1
|
0.4
|
$37.80
|
Cavity Battens
|
15.0
|
m
|
1.5
|
0.1
|
1.5
|
$90.00
|
Cavity Closer
|
3.0
|
m
|
3
|
0.1
|
0.3
|
$22.50
|
Linea Weatherboard
|
7.2
|
m²
|
60
|
1.3
|
9.0
|
$837.00
|
Paint
|
7.2
|
m²
|
16
|
|
|
$115.00
|
|
|
|
|
|
Subtotal
|
$1,743.39
|
Brick Veneer - Insulated to R2.6
|
|
|
|
|
|
Qty
|
Unit
|
Rate
|
Labour
|
|
Amount
|
|
|
|
|
Factor
|
Qty
|
|
100x50 Plate
|
6.0
|
m
|
4.2
|
0.1
|
0.7
|
$57.60
|
DPC
|
3.0
|
m
|
0.6
|
0.5
|
0.2
|
$8.55
|
Fixings
|
4.0
|
no
|
3.5
|
0.2
|
0.8
|
$50.00
|
100x50 Studs
|
16.8
|
m
|
4.2
|
0.1
|
1.7
|
$146.16
|
100x50 Dwangs
|
6.0
|
m
|
4.2
|
0.2
|
1.1
|
$73.80
|
10 Gib interior
|
7.2
|
m²
|
6.3
|
0.2
|
1.4
|
$110.16
|
Stopping Gib
|
7.2
|
m²
|
6.5
|
|
|
$46.80
|
Ev Ceiling Junction
|
3.0
|
m
|
9.5
|
|
|
$28.50
|
Insulation R2.6
|
7.2
|
m²
|
13
|
0.1
|
0.6
|
$119.52
|
Building Wrap
|
7.2
|
m²
|
3
|
0.1
|
0.4
|
$37.80
|
Bricks
|
7.2
|
m²
|
80
|
|
|
$576.00
|
3 Coat Plaster
|
7.2
|
m²
|
55
|
|
|
$396.00
|
Paint
|
7.2
|
m²
|
14
|
|
|
$100.80
|
|
|
|
|
|
Subtotal
|
$1,751.69
|
|
|
|
|
|
|
|
Concrete Block - Insulated to R2.2
|
|
|
|
|
|
Qty
|
Unit
|
Rate
|
Labour
|
|
Amount
|
|
|
|
|
Factor
|
Qty
|
|
200 Series Blockwork
|
6.0
|
m²
|
110
|
|
|
$792.00
|
Concrete Filling
|
3.0
|
m³
|
200
|
0.1
|
0.7
|
$171.50
|
Reinforcing steel
|
32.0
|
kg
|
3.5
|
0.0
|
1.3
|
$169.60
|
10 Gib interior
|
7.2
|
m²
|
6.3
|
0.2
|
1.4
|
$110.16
|
Stopping Gib
|
7.2
|
m²
|
6.5
|
|
|
$46.80
|
Ev Ceiling Junction
|
3.0
|
m
|
9.5
|
|
|
$28.50
|
Battens 100x50
|
20.4
|
m
|
4
|
0.1
|
2.0
|
$173.40
|
DPC
|
20.4
|
m
|
0.4
|
0.1
|
1.0
|
$54.06
|
Fixings
|
34.0
|
no
|
1
|
0.1
|
2.7
|
$156.40
|
Insulation 2.2
|
7.2
|
m²
|
8
|
0.1
|
0.6
|
$83.52
|
Multiplst mesh to corners and reveals ONLY
|
7.2
|
m²
|
50
|
|
|
$360.00
|
|
|
|
|
|
Subtotal
|
$2,145.94
|
|
|
|
|
|
|
|
Tilt slab / Precast Panel - Insulated to R2.2
|
|
|
|
|
Qty
|
Unit
|
Rate
|
Labour
|
|
Amount
|
|
|
|
|
Factor
|
Qty
|
|
150 Precast Panel
|
7.2
|
m²
|
82
|
1.35
|
9.72
|
$1,027.80
|
10 Gib interior
|
7.2
|
m²
|
6.3
|
0.2
|
1.4
|
$110.16
|
Stopping Gib
|
7.2
|
m²
|
6.5
|
|
|
$46.80
|
Ev Ceiling Junction
|
3.0
|
m
|
9.5
|
|
|
$28.50
|
Battens 100x50
|
20.4
|
m
|
4
|
0.1
|
2.0
|
$173.40
|
DPC
|
20.4
|
m
|
0.4
|
0.1
|
1.0
|
$54.06
|
Fixings
|
34.0
|
no
|
1
|
0.1
|
2.7
|
$156.40
|
Insulation 2.2
|
7.2
|
m²
|
8
|
0.1
|
0.6
|
$83.52
|
Multiplst mesh to corners and reveals ONLY
|
7.2
|
m²
|
50
|
|
|
$360.00
|
|
|
|
|
|
Subtotal
|
$2,040.64
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
All Comparisons are based on typical house construction. Not including Margins, GST, Interior paint or Special Foundations.
|
|
|
|
|
|
|
|
|
1) Cost will vary from region to region
|
|
|
2) Insulated Concrete Formwork (Insulform NZ Ltd) is now the most competitive reinforced concrete wall system for solid construction homes.
|
|
3) Insulform has an R value of R3 (double the Code Required)
|
|
4) Insulform Building Systems require: 1. an approved plastering System 2. A fully meshed Plastering system.
|
|